ACI Concrete Flatwork Finisher

ACI Concrete Flatwork Finisher | KSA

  • Date:29/04/2025
  • Country:KSA
  • City:Riyadh
  • Duration:2 days

Overview:

  • Planning for slab-on-ground placement
  • Concrete materials, mixture proportioning, and control tests
  • Preparation before placing concrete
  • Floor flatness and levelness
  • Placing equipment
  • Finishing tools and equipment
  • Procedures for finishing slabs-on-ground
  • Jointing
  • Curing and protection of concrete
  • Finishing problems and possible solutions
Share on