The project consists of trains and buses, which will create six main Metro lines, penetrating the capital Saudi Arabia Riyadh from all directions, and includes 85 stations, 176 KM of tracks, at an estimated cost of $30 billion.
ACTS scope of work includes deploying more than 150 QC technicians, and establishing two (2) fully equipped site laboratories to test all construction materials on Line 1 and Line 2, which are under BACS consortium. Furthermore, ACTS performed many NDT testing on concrete slabs, concrete piles, and steel joints, in addition to conducting geotechnical and geophysical investigations of the underground. The estimated total value of performed and on-going services is $30 M.